[VA/VE Prototype Proposal Example] Process Shortening
Introducing a case study that achieved a reduction in delivery time due to changes in the processing engineering.
Zawakawa Forging Industry Co., Ltd. is a company engaged in the manufacturing of cold-forged bearing products, machining of hydraulic pump parts, and production of aluminum machined products. We are introducing a case where changing the method of product handling has enabled simultaneous grinding processing at two locations, achieving a reduction in delivery time. 【Key Achievements】 "Reduced 5 processes to 3" "Improved production efficiency due to reduced setup time" "Stable quality and reduced defect rate" 【Consultation Details】 ■Consultant: Major construction machinery manufacturer ■Product Name: Shaft parts used in the engine section of a caterpillar (8,000 pieces of 4 types per month) ■Content: Review of the machining process *For more details, please refer to the catalog or feel free to contact us.
- Company:澤川鍛造工業
- Price:Other